Project Establishment (DFM)
Standardized Process for Die Casting Project Review
Pre-Project Kickoff Review
1.1 Feasibility Review
· Submit Project Feasibility Report
· Confirm product specifications (tolerances/material/performance metrics)
· Evaluate budget & ROI timeline
2. Design Phase Review
A[3D Model Review] --> B[Mold Flow Analysis Report] --> C[DFM Report] --> D[Trial Production Plan Approval]
3. Trial Production Review
3.1 First Article Inspection (FAI)
· Full dimensional report (CMM data)
· X-ray inspection (porosity/shrinkage analysis)
· Mechanical testing (hardness/tensile strength)
3.2 Process Capability Validation
· Cpk≥1.33 (critical dimensions)
· Shot curve stability analysis
· Mold temperature control verification
Continuous Improvement Review
· Quarterly QCC meetings
· SPC process monitoring (X-bar R control charts)
· Annual mold health assessment (T0 trial reproduction)
Special Notes (2025 Updates):
◾ Carbon Neutrality Review required:
· Recycled aluminum usage ratio certification (≥30%)
· Carbon emission report for die-casting units
· Scrap recycling rate certification (≥95%)
◾ Mandatory use of digital review systems (e.g., TÜV-certified iReview 4.0) for paperless workflows.
Formatted with clear hierarchies and technical accuracy while preserving critical data points.
This website uses cookies to enhance your browsing experience and improve our services. By continuing to browse, you agree to our use of cookies in accordance with our Privacy Policy. You can manage your cookie preferences at any time.