Drawing Design & Confirm

Die Casting Mold Design Drawing Requirements and Confirmation Specifications

(Applies to automotive/3C/aerospace die casting molds)

‌I. Core Design Specifications‌


‌Digital Design Requirements‌

· ‌Software‌:

· Mandatory use of AI-optimized CAD tools (e.g., AutoCAD 2025/Autodesk Fusion).

· File formats: STEP/IGES (compatible with digital twin systems).

· ‌Tolerances‌:

· Critical dimensions: ±0.02mm (red-label zones).

· General dimensions: ±0.05mm (blue-label zones).

‌Structural Design‌

· ‌Mold Cavity & Runners‌:

· Runner cross-sectional area deviation ≤1.5% (AI flow simulation report required).

· Cooling channel spacing ≤30mm (validated via thermal imaging).

· ‌Ejection System‌:

· Ejector pin diameter ≥Φ3mm (fatigue life ≥500,000 cycles).

2025 Mandatory Additions‌

· ‌Smart Integration‌:

· IoT sensor ports (temperature/pressure/vibration) must be embedded in mold design.

· QR code traceability labels (material batch/version/carbon footprint).

· ‌Eco-Compliance‌:

· Priority for low-carbon mold steel (emissions ≤1.8kgCO₂/kg).

· Scrap mold recycling rate ≥95% (recycling agreement required).

Signatures & Archiving‌

E-Signatures‌:

· Digital signatures from designer/reviewer/approver (eIDAS 2.0 compliant).

Cloud Storage‌:

· Saved to enterprise blockchain (1 main chain + 2 backups).

· Encryption: AES-256 + quantum-safe protocols.

‌Non-Compliance Penalties

-Design permissions frozen if AI review fails.

-Mould steel without recycling mark is prohibited (fines refer to EU 2025/EMD regulations)

‌Drawing Approval Process

flowchart TD

A[Design Submission] --> B{AI Compliance Review}

B1 -->|Approved| C[Expert Team Review]

B2 -->|Rejected| D[Revise & Resubmit]

C --> E[3D-Printed Prototype Validation]

E --> F[Blockchain Archiving]

 

Review Focus‌

· ‌Material Compatibility‌: Thermal expansion coefficient difference ≤5% between mold steel and casting alloy.

· ‌Sustainability Metrics‌:

· Mold lifespan ≥200,000 cycles (CAE fatigue analysis required).

· Repairability score ≥90% (per ISO 14006:2025).

Drawing Approval Process

This website uses cookies to enhance your browsing experience and improve our services. By continuing to browse, you agree to our use of cookies in accordance with our Privacy Policy. You can manage your cookie preferences at any time.